Shanghai Mingjia New Material Technology Co., Ltd
VN-MGHE series ceramic coating manual
Coating parameters
| ||||
1) |
|
|
|
|
2) |
|
|
|
|
3) |
| 1.25±0.05g/cm3 | 1.05±0.05g/cm3 | 20℃ |
4) |
| 25-30μm |
|
|
5) |
| 4~6m2/ kg |
| |
6) |
|
| ||
7) |
|
| ||
Coating performance
| ||
|
|
|
|
| ≥50 |
|
| ≥8H |
|
|
|
|
|
|
|
|
|
|
|
|
Shanghai Mingjia New Material Technology Co., Ltd
VN-MGHE series ceramic coating manual
| ||||
1) |
|
|
|
|
2) |
|
|
|
|
3) |
| 1.25±0.05g/cm3 | 1.05±0.05g/cm3 | 20℃ |
4) |
| 25-30μm |
|
|
5) |
| 4~6m2/ kg |
| |
6) |
|
| ||
7) |
|
| ||
| ||
|
|
|
|
| ≥50 |
|
| ≥8H |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E=0.2 |
|
|
|
|
| ≥200 |
|
|
|
|
|
|
|
|
|
3. Painting construction guidance
l Substrate: iron, aluminum, cast aluminum, stainless steel injection.
l Sandblasting: Use 60 mesh: 80 mesh = 1:1 brown fused alumina sand or white fused alumina sand, and the surface roughness of the workpiece after sandblasting is 3.0~3.5μm
l Dust/oil: Remove sand and dust on the surface, and ensure that the surface of the workpiece is clean and free of oil stains or other foreign matter.
l Substrate preheating: The workpiece temperature needs to be heated to 50-60° before spraying.
l Construction method: conventional air spray gun, recommended spray gun caliber primer: 1.3mm, top coat 0.8-1.3mm.
l Curing baking temperature: 280 °/10-15 minutes
4. Maturation and filtration
1)Temperature control The maturation environment and coating temperature are kept at 20~25°C;
2)The primer A component and the topcoat B component are pre-rolled, and the paint bucket rotation speed is 120~150 rpm until all the precipitate is dispersed and there is no precipitation.
3)Mix the [B] component and the C component [catalyst] first, then add the [A] component and tighten the cap, and shake quickly for 10~ 20 seconds;
4)The maturation paint barrel is rolled at a speed of 120~150 rpm for more than 6-8 hours. (The maturation time is related to temperature and speed);
5)Filter with a 300-mesh filter cloth before use. (Add pearlescent powder after straining the topcoat).
5. Storage
The paint is valid for more than 90 days under the condition of 5~25°C before maturation, and should be sealed and stored in a cool, ventilated and dry room, avoiding direct sunlight and away from fire sources. Once the paint has matured, use it within 48 hours. If there is a part leftover, please store it in an environment of 5~10°C, and when using it after refrigeration, you must wait for the paint to heat up to room temperature (20~25°C) before use.
Shanghai Mingjia New Material Technology Co., Ltd
Address: No. 130, Muhua Road, Shanghai Chemical Industry Zone Tel: 13120910988
Fax: 021-67121456
Http: //www.meengia.com