Current place of residence:SuzhouNationality: Han nationality Marital status:unmarried
Expected salary (before taxes):22KEntry time: one month
Education
2015.09-2019.07 Hebei University of Science and Technology (B.S.) Material formingand control process
2019.09-2022.07 Jiangsu University of Science and Technology (M.S.) Materials Engineering
English Proficiency: CET-6
Certificate:IWE(International Welding Engineer).
Personaladvantage
1. Familiar with the process development process of new energy vehicle power supply electronic control and drive assembly products, and have practical experience in new process development and introduction.
2. Good at fastener process development to ensure high-quality product production.
3. With rich experience in lineconstructionand commissioning, we can quickly solve on-site technical problems and ensure the efficient operation of the production line.
Workexperience
Process Engineer of SuzhouInovance United Power SystemCo., Ltd
2022.07-present
Content:
1. Responsible for the process development of electric drive assembly products for new energy vehicles, innovate and optimize the process scheme, andimprove the process level.
2. Responsible for the introduction of new projects, identification of four new processes(newtechnology, new materials, new equipment,newprocesses)and four new management.
3. Preparation of process documents for new products(flow path diagram, PFMEA,work instructions, list of newequipment treatment tools, list of special characteristics of the process,foolproof and error-prooflist, etc.).
4. Leadthe prototype trial production activities, responsible for tooling design drawings, purchase, and acceptance.
5. Responsible for the initial process capability analysis and verification of the A/B prototype of the P1project, follow up the prototype trial production problem solving, and identify the manufacturable problems.
6. Compile theSPEC of the wire body and perform the line experience receiving test with the wire body supplier.
7. Responsible forPLM&MESsystem maintenance, on-site equipment transformation and the implementation of lean production methods to improve production efficiency and product quality.
Performance:22years of positive performance: A(top 10%),23 years of annual performance:A (top 10%), 24years of annual performance:B+(proportion of 30%-50%)
Projectexperience
Lixianghigh-pressure oil-cooled electric drive assemblyprocessengineer
1. Lead the development of the idealWseries electric driveassembly fromBsample toCsample, outputPFMEAriskanalysis report, and identify key control points.
2. Optimize the visual inspection system and adopt vPr. The algorithm realizes FIPG defect detection, reduces the visual false alarm rate of the production line, and improves the TA index of the production line.
3. Coordinate the whole process of PPAPmass productionreview, submit6major process documents, andobtainaccess conditions.
4. Through process optimization and equipmenttransformation(CTfrom72sto60s),perfectproduct error prevention,finish400 units in a single shift.
5. Sort out the product scrapping process, formulate parts scrapping standards, and reduce the manufacturing cost by about 3.2 million yuan in the product cycle.
Cheryall-in-one electric drive integratedprocessengineer
1. Responsible for the transformation and compatibility of QR multi-line body, complete the manufacturing system plan from shafting to assembly, and achieve the cost target and line investment target.
2. The leading product A-sample trial production tooling reduces the cost, improves the maturity of process verification in the trial production workshop, and meets the installation requirements of customer prototypes and R&D internal test prototypes.
3. In the early stage of the project, promote the standardization of tightening equipment and the unification of electrical logic, formulate the single-point process requirements for tightening, and output the tighteningmasterfile.
4. Optimize and adjust the press-fittingmechanism to the wiresupplier, and output the process verification list of the new line products.
5. Sort out the equipment data upload list,ensure the accurate traceability of the uploaded data in the MES system, and realize the automaticSPCcalculation of part of the data, and effectively monitor the process variation.
6. Complete the product valve audit, promote theproduction line climbing, and achieve the mass production handover index.