TECHNICAL REQUIREMENTS  技术要求
No. 21-012-2025  编号 21-012-2025
VSMPO - AVISMA Corporation
VSMPO - AVISMA 公司
Technical Requirements  技术要求 Sheet 2 of 24
第 2 页,共 24 页
No. 21 012 2025 21 012 2025 21-012-202521-012-2025  编号 21 012 2025 21 012 2025 21-012-202521-012-2025
VSMPO - AVISMA Corporation Technical Requirements Sheet 2 of 24 No. 21-012-2025 | VSMPO - AVISMA Corporation | Technical Requirements | Sheet 2 of 24 | | :---: | :---: | :---: | | | No. $21-012-2025$ | |

Table of Contents  目录

Approval Sheet … 3  批准表 … 3
1 Equipment Name … 4
1 设备名称 … 4

2 Purpose for Development. … 4
2 开发目的 … 4

3 Requirements for Ensuring the Technological Process … 4
3 确保工艺过程的要求 … 4

4 Technical Requirements for the Equipment Characteristics … 5
4 设备特性技术要求 … 5

5 Operational Requirements … 12
5 运行要求 … 12

6 Requirements for Methods and Conditions of Monitoring … 14
6 监测方法和条件要求 … 14

7 Requirements for Compliance with the Legal Framework … 15
7 法律框架合规要求 … 15

8 Requirements for Technical (Supply) Documentation … 16
8 技术(供应)文件要求 … 16

9 Personnel Training Requirements … 18
9 人员培训要求 … 18

10 Requirements for Installation and Commissioning … 18
10 安装和调试要求 … 18

11 Requirements for Testing and Acceptance … 19
11 测试和验收要求 … 19

12 Warranty … 20
12 保修 … 20

13 Special Requirements … 20
13 特殊要求 … 20

14 Appendices … 21
14 附录 … 21

Amendment Record Sheet … 23
修订记录表 … 23
VSMPO - AVISMA Corporation
VSMPO - AVISMA 公司
Technical Requirements  技术要求 Sheet 3 of 24
第 3 页,共 24 页
No. 21 012 2025 21 012 2025 21-012-202521-012-2025  编号 21 012 2025 21 012 2025 21-012-202521-012-2025
VSMPO - AVISMA Corporation Technical Requirements Sheet 3 of 24 No. 21-012-2025 | VSMPO - AVISMA Corporation | Technical Requirements | Sheet 3 of 24 | | :---: | :---: | :---: | | | No. $21-012-2025$ | |

Approval Sheet  批准表

DEVELOPED by:  制定者:
Position  职位 Full Name  全名 Signature  签名 Date  日期
Manager, Shop 21  21 号店经理 D.V.Vinokurov
Deputy Manager, Shop 21, Equipment
车间 21 副经理,设备部
B.V.Gruzdev
Acting Mechanical engineer, Shop 21
车间 21 代理机械工程师
S.O.Kordyukov
Electrician, Shop 21  电工,车间 21 D.S.Svinin
Power Engineer, Shop 21
动力工程师,车间 21
T.A.Maksimov
Manager, Process Bureau, Shop 21
车间 21 工艺局经理
V.P.Bobrov
Lead Process - Engineer, Shop 21
车间 21 首席工艺工程师
D.V.Zhbanov
Position Full Name Signature Date Manager, Shop 21 D.V.Vinokurov Deputy Manager, Shop 21, Equipment B.V.Gruzdev Acting Mechanical engineer, Shop 21 S.O.Kordyukov Electrician, Shop 21 D.S.Svinin Power Engineer, Shop 21 T.A.Maksimov Manager, Process Bureau, Shop 21 V.P.Bobrov Lead Process - Engineer, Shop 21 D.V.Zhbanov | Position | Full Name | Signature | Date | | :--- | :--- | :--- | :--- | | Manager, Shop 21 | D.V.Vinokurov | | | | Deputy Manager, Shop 21, Equipment | B.V.Gruzdev | | | | Acting Mechanical engineer, Shop 21 | S.O.Kordyukov | | | | Electrician, Shop 21 | D.S.Svinin | | | | Power Engineer, Shop 21 | T.A.Maksimov | | | | Manager, Process Bureau, Shop 21 | V.P.Bobrov | | | | Lead Process - Engineer, Shop 21 | D.V.Zhbanov | | |
APPROVED by:  批准人:
Position  职位 Full Name  全名 Signature  签名 Date  日期
Director, Science and Technology Manager, VSMPO R&D Center
VSMPO 研发中心科学与技术经理、主管
M.O.Leder
Chief Process Engineer  首席工艺工程师 D.A. Piskunov  D.A. 皮斯库诺夫
Chief Power Engineer  首席电气工程师 K. Yu. Pankratov  K. Yu. 潘克拉托夫
Deputy Director, VSMPO Technical Support and Repair
副主任,VSMPO 技术支持与维修部
A.K.Melnikov  A.K.梅尔尼科夫
Chief Mechanical Engineer
总机械工程师
S. A. Moshkov  S. A. 莫什科夫
Manager, Shop 24  24 号车间经理 D.V.Devichenskiy
Department 19  第 19 部门 D.A.Maslennikov
Position Full Name Signature Date Director, Science and Technology Manager, VSMPO R&D Center M.O.Leder Chief Process Engineer D.A. Piskunov Chief Power Engineer K. Yu. Pankratov Deputy Director, VSMPO Technical Support and Repair A.K.Melnikov Chief Mechanical Engineer S. A. Moshkov Manager, Shop 24 D.V.Devichenskiy Department 19 D.A.Maslennikov | Position | Full Name | Signature | Date | | :--- | :--- | :--- | :--- | | Director, Science and Technology Manager, VSMPO R&D Center | M.O.Leder | | | | Chief Process Engineer | D.A. Piskunov | | | | Chief Power Engineer | K. Yu. Pankratov | | | | Deputy Director, VSMPO Technical Support and Repair | A.K.Melnikov | | | | Chief Mechanical Engineer | S. A. Moshkov | | | | Manager, Shop 24 | D.V.Devichenskiy | | | | Department 19 | D.A.Maslennikov | | |
VSMPO - AVISMA Corporation
VSMPO - AVISMA 公司
Technical Requirements  技术要求 Sheet 4 of 24
第 4 页 共 24 页
No. 21 012 2025 21 012 2025 21-012-202521-012-2025  编号 21 012 2025 21 012 2025 21-012-202521-012-2025
VSMPO - AVISMA Corporation Technical Requirements Sheet 4 of 24 No. 21-012-2025 | VSMPO - AVISMA Corporation | Technical Requirements | Sheet 4 of 24 | | :---: | :---: | :---: | | | No. $21-012-2025$ | |

1 Equipment Name:  1 设备名称:

Supply of a horizontal milling machine to replace the horizontal boring machine Mod. 2A622F20 Inv. No. 14374, Serial No. 15 in Shop 21, year of manufacture - 1992.
供应一台卧式铣床,以替换车间 21 中型号为 2A622F20、编号为 14374、序列号为 15 的卧式镗床,制造年份为 1992 年。

2 Purpose for Development:
2 开发目的:

Measures to eliminate the comments of the “Act of inspection of the object No. 1 dated February 16, 2024” in Shop 21.
采取措施消除 2024 年 2 月 16 日车间 21“第 1 号对象检查报告”中的意见。

2.1 Location of the object:
2.1 对象位置:
The machine is located on the territory of VSMPO-AVISMA Corporation, Verkhnyaya Salda, Site B, in Shop 21, at the machining area No. 1 and is designed for milling end faces and centering bars and billets manufactured of titanium and super alloys.
该机器位于 VSMPO-AVISMA 公司领地内,Verkhnyaya Salda,B 区,21 号车间,加工区 1 号,设计用于铣削钛及超合金制造的端面和定位棒及坯料。

2.2. These Technical Requirements shall constitute a part of the Equipment Supply Agreement.
2.2. 本技术要求应构成设备供应协议的一部分。

3 Requirements for Ensuring the Technological Process
3 确保工艺过程的要求

Centering of bars shall be done both manually and automatically.
棒材的定位应采用手动和自动两种方式进行。

3.1 Centering of a bar with uncut defective ends:
3.1 带有未切割缺陷端的棒材的定心:
The bar is moved by the operator to the processing area using an electric overhead crane and installed on the fixture fixed. The operator specifies the diameter of the bar in the program and performs milling of the bar face end. Then the center of the bar is automatically found (using sensors, probes, laser markings, etc. - The design shall be agreed with the Customer), after which the bar is centered according to the set program.
操作员使用电动桥式起重机将棒材移至加工区域,并安装在固定的夹具上。操作员在程序中指定棒材的直径,并对棒材端面进行铣削。然后自动找到棒材的中心(使用传感器、探头、激光标记等——设计方案需与客户协商),随后根据设定程序对棒材进行定心。

3.2 Centering of bars with pre-prepared face ends.
3.2 预先准备好端面的棒材定心。
The diameter of the bar is determined automatically. The bar is placed on the fixture. The operator starts the centering operation in automatic mode.
棒材的直径自动测定。将棒材放置在夹具上。操作员启动自动模式下的定心操作。
Overall dimensions of the processed forging stocks:
加工锻件毛坯的总体尺寸:
  • Weight of forging stock: up to 6500 kg (мах).
    锻件毛坯重量:最大可达 6500 公斤。
  • Sizes of forging stock 200 mm ( min ) , L 1000 mm ( min ) 200 mm ( min ) , L 1000 mm ( min ) O/200mm(min),L1000mm(min)\varnothing 200 \mathrm{~mm}(\min ), \mathrm{L} 1000 \mathrm{~mm}(\min ).
    锻件毛坯尺寸 200 mm ( min ) , L 1000 mm ( min ) 200 mm ( min ) , L 1000 mm ( min ) O/200mm(min),L1000mm(min)\varnothing 200 \mathrm{~mm}(\min ), \mathrm{L} 1000 \mathrm{~mm}(\min )
Ø 800 mm (max), L 6000 mm (max).
最大直径 800 毫米,最大长度 6000 毫米。
  • Distortion: up to 10.0 mm over the entire length.
    变形:整个长度范围内最大 10.0 毫米。
VSMPO - AVISMA Corporation
VSMPO - AVISMA 公司
Technical Requirements  技术要求 Sheet 5 of 24
第 5 页,共 24 页
No. 21 012 2025 21 012 2025 21-012-202521-012-2025  编号 21 012 2025 21 012 2025 21-012-202521-012-2025
VSMPO - AVISMA Corporation Technical Requirements Sheet 5 of 24 No. 21-012-2025 | VSMPO - AVISMA Corporation | Technical Requirements | Sheet 5 of 24 | | :---: | :---: | :---: | | | No. $21-012-2025$ | |
  • End face for centering after forging with the defective end face cut off:
    锻造后切除缺陷端面后的定位端面:

  • End face for centering after forging without the defective end face cut off for milling for centering:
    锻造后未切除缺陷端面,用于铣削定位的端面:

4 Technical Requirements for Equipment Characteristics
4 设备特性技术要求

4.1 The machine shall meet the requirements of GOST 12.2.003 “Occupational safety standards system. Industrial equipment. General safety requirements” and GOST 12.2.009 “Metal-working machines. General safety requirements”, the requirements of the “Rules on labor protection when processing metals” approved by Order of the Ministry of Labor and Social Protection of the Russian Federation No. 887n dated December 11, 2020. Railings, platforms for maintenance and repair, and stairs shall comply with the requirements of the “Rules on Occupational safety when working at height.”
4.1 该机器应符合 GOST 12.2.003《职业安全标准体系。工业设备。一般安全要求》和 GOST 12.2.009《金属加工机床。一般安全要求》的要求,以及俄罗斯联邦劳动和社会保护部于 2020 年 12 月 11 日第 887n 号令批准的《金属加工劳动保护规则》的要求。栏杆、维护和修理平台及楼梯应符合《高空作业职业安全规则》的要求。
All external elements of the complex of technical means of the system that are under voltage shall be protected from accidental contact, the actual technical means shall have a protective grounding in accordance with GOST 12.1.030-81 and the "Electric Installation Code " (EIC).
系统技术手段综合体的所有带电外部元件应防止意外接触,实际技术手段应按照 GOST 12.1.030-81 和《电气装置规范》(EIC)进行保护接地。
VSMPO - AVISMA Corporation
VSMPO - AVISMA 公司
Technical Requirements  技术要求 Sheet 6 of 24
第 6 页 共 24 页
No. 21 012 2025 21 012 2025 21-012-202521-012-2025  编号 21 012 2025 21 012 2025 21-012-202521-012-2025
VSMPO - AVISMA Corporation Technical Requirements Sheet 6 of 24 No. 21-012-2025 | VSMPO - AVISMA Corporation | Technical Requirements | Sheet 6 of 24 | | :---: | :---: | :---: | | | No. $21-012-2025$ | |
Table 1 - Main technical characteristics of the machine.
表 1 - 机器主要技术参数
No.  编号 Characteristic  特性 Value  数值
1 Accuracy class  精度等级 H
2 Dimensions of the working surface of a table, mm:
工作台面尺寸,毫米:
2000x1000
3 Table load capacity, kg
工作台承载能力,千克
5000
4 Spindle taper  主轴锥度 ISO50
5 Maximum travel, mm:  最大行程,毫米: 1400x800
6 Spindle speed limits, rpm.:
主轴转速限制,转/分钟:
25 . . .2000 25 . . .2000 25...200025 . . .2000
7

工作进给速度限制, mm / min mm / min mm//min\mathrm{mm} / \mathrm{min} - X, Y, Z
Limits of working feeds, mm / min mm / min mm//min\mathrm{mm} / \mathrm{min}
- X,Y,Z
Limits of working feeds, mm//min - X,Y,Z| Limits of working feeds, $\mathrm{mm} / \mathrm{min}$ | | :--- | | - X,Y,Z |
6,3.... 1000
8 Limits of the speed of rapid movements, mm / min mm / min mm//min\mathrm{mm} / \mathrm{min} - X, Y, Z
快速移动速度限制, mm / min mm / min mm//min\mathrm{mm} / \mathrm{min} - X, Y, Z
3000
9 The maximum permissible torque on the spindle, Nm: retractable (boring) spindle
主轴最大允许扭矩,牛·米:可伸缩(镗削)主轴
10000
10

最大允许进给力,牛顿:- X,Y,Z
The maximum allowable feed force, N :
- X,Y,Z
The maximum allowable feed force, N : - X,Y,Z| The maximum allowable feed force, N : | | :--- | | - X,Y,Z |
11000
11 Main drive power, at least, kW
主驱动功率,至少,千瓦
7
12

包括工作台和滑座行程的外形尺寸,毫米:- 长度 - 宽度 - 高度
Overall dimensions including the stroke of the table and the sled, mm:
- length
- width
- height
Overall dimensions including the stroke of the table and the sled, mm: - length - width - height| Overall dimensions including the stroke of the table and the sled, mm: | | :--- | | - length | | - width | | - height |
4610
4150
3500
4610 4150 3500| 4610 | | :--- | | 4150 | | 3500 |
No. Characteristic Value 1 Accuracy class H 2 Dimensions of the working surface of a table, mm: 2000x1000 3 Table load capacity, kg 5000 4 Spindle taper ISO50 5 Maximum travel, mm: 1400x800 6 Spindle speed limits, rpm.: 25...2000 7 "Limits of working feeds, mm//min - X,Y,Z" 6,3.... 1000 8 Limits of the speed of rapid movements, mm//min - X, Y, Z 3000 9 The maximum permissible torque on the spindle, Nm: retractable (boring) spindle 10000 10 "The maximum allowable feed force, N : - X,Y,Z" 11000 11 Main drive power, at least, kW 7 12 "Overall dimensions including the stroke of the table and the sled, mm: - length - width - height" "4610 4150 3500"| No. | Characteristic | Value | | :--- | :--- | :--- | | 1 | Accuracy class | H | | 2 | Dimensions of the working surface of a table, mm: | 2000x1000 | | 3 | Table load capacity, kg | 5000 | | 4 | Spindle taper | ISO50 | | 5 | Maximum travel, mm: | 1400x800 | | 6 | Spindle speed limits, rpm.: | $25 . . .2000$ | | 7 | Limits of working feeds, $\mathrm{mm} / \mathrm{min}$ <br> - X,Y,Z | 6,3.... 1000 | | 8 | Limits of the speed of rapid movements, $\mathrm{mm} / \mathrm{min}$ - X, Y, Z | 3000 | | 9 | The maximum permissible torque on the spindle, Nm: retractable (boring) spindle | 10000 | | 10 | The maximum allowable feed force, N : <br> - X,Y,Z | 11000 | | 11 | Main drive power, at least, kW | 7 | | 12 | Overall dimensions including the stroke of the table and the sled, mm: <br> - length <br> - width <br> - height | 4610 <br> 4150 <br> 3500 |
4.2. The machine shall consist of:
4.2. 该机床应包括:
  • a longitudinally traveling column with a spindle head located on it with a retractable slider;
    一根纵向移动的立柱,立柱上装有带可伸缩滑块的主轴头;
  • a rotating hollow spindle is built into the slider, the end of which is used to install and secure the tool. The end of the slider shall have seats for the mounting and fixing of milling heads;
    滑块内装有一个旋转的空心主轴,其端部用于安装和固定刀具。滑块端部应设有用于安装和固定铣头的座位;
  • a fixed table (plate) with T-shaped slots is located next to the rack on the foundation.
    固定工作台(板),带有 T 型槽,位于基础上的立柱旁边。
VSMPO - AVISMA Corporation
VSMPO - AVISMA 公司
Technical Requirements  技术要求 Sheet 7 of 24
第 7 页,共 24 页
No. 21 012 2025 21 012 2025 21-012-202521-012-2025  编号 21 012 2025 21 012 2025 21-012-202521-012-2025
VSMPO - AVISMA Corporation Technical Requirements Sheet 7 of 24 No. 21-012-2025 | VSMPO - AVISMA Corporation | Technical Requirements | Sheet 7 of 24 | | :---: | :---: | :---: | | | No. $21-012-2025$ | |
4.2.1 The design of the spindle device shall ensure long-term accuracy, increased rigidity, vibration resistance and minimal heating.
4.2.1 主轴装置的设计应确保长期精度、提高刚性、抗振动能力及最小的发热量。

4.2.2 The mechanized tool clamp shall ensure reliable fastening of the tool in the spindle of the machine.
4.2.2 机械化刀具夹紧装置应确保刀具在机床主轴中的可靠固定。

4.2.3 Long-term preservation of accuracy, smooth and precise movement of moving units shall be ensured by:
4.2.3 应通过以下方式确保长期保持精度、运动部件的平稳和精确运动:
  • combined guides along X, Y, Z: horizontal and face sliding (cast iron-fluorlon/ZX100 K ) and lateral rolling (hardened steel - rolling bearings);
    X、Y、Z 方向的组合导轨:水平和端面滑动(铸铁-氟龙/ZX100 K)及侧向滚动(硬化钢-滚动轴承);

    4.2.4 In the hydraulic system of the machine, provide for the installation of hydraulic equipment of serial production in Russia or friendly countries (the Contractor will use components from other manufacturers, in agreement with the Customer, during the period of design work). Kitting of parts shall be agreed upon with the Customer. Provide installation of the hydraulic unit in a sump to collect possible oil leaks.
    4.2.4 在机器的液压系统中,应安装俄罗斯或友好国家的系列生产液压设备(承包商在设计工作期间,经客户同意,可使用其他制造商的组件)。零部件的配套应与客户协商。液压单元应安装在油槽中,以收集可能的漏油。

    4.2.5 In the pneumatic system of the machine (if necessary), apply the element base of FESTO, SMC or their analogues. Provide an air conditioning unit with automatic condensate discharge.
    4.2.5 在机器的气动系统中(如有必要),应采用 FESTO、SMC 或其同类产品的元件基础。应配备带自动冷凝水排放的空调装置。

    4.2.6 The guides of the bed, lower sled and traveling column shall be covered with metal protection to prevent damage to the guides.
    4.2.6 床身、下滑板和行走立柱的导轨应覆盖金属保护层,以防止导轨受损。

    4.2.7 Centralized, automated lubrication of guides. Provide for dividing the hydraulic station tank into sealed compartments or separate tanks for the hydraulic system from the lubrication system.
    4.2.7 导轨的集中自动润滑。液压站油箱应分隔为密封隔间或将液压系统油箱与润滑系统油箱分开。

    4.2.8 Develop a project and install separate oil collection systems from the guides of the slider and traveling column, after agreeing on the system design with the “Customer”.
    4.2.8 制定项目方案并安装滑块和行走立柱导轨的独立集油系统,系统设计需与“客户”协商一致。

    4.2.9 Develop and install a tool cooling system in the cutting zone (external). Provide the possibility of cooling the tool with both coolant and compressed air.
    4.2.9 设计并安装切削区(外部)刀具冷却系统,确保刀具既能用冷却液冷却,也能用压缩空气冷却。

    4.2.10 Develop a project and install a system for collecting and discharging coolant from the processing area to the cooling station, after agreeing on the design of the system with the “Customer”.
    4.2.10 制定项目方案并安装从加工区域收集并排放冷却液至冷却站的系统,系统设计需与“客户”协商一致。

    4.2.11 Provide a chip conveyor in the machine design, the distance from the floor to the edge of the conveyor shall be at least 1000 1200 mm 1000 1200 mm 1000-1200mm1000-1200 \mathrm{~mm}. The conveyor design shall be agreed with the Customer.
    4.2.11 在机床设计中提供排屑输送机,地面至输送机边缘的距离应不少于 1000 1200 mm 1000 1200 mm 1000-1200mm1000-1200 \mathrm{~mm} 。输送机设计需与客户协商一致。

    4.2.12 The column with the spindle of the machine shall be movable, since the bar, when centered, is fixed on the machine table and in a special fixture (V-block with a reverse cone or self-centering V-blocks moving in a horizontal plane).
    4.2.12 机床的主轴立柱应可移动,因为当棒材居中时,会固定在机床工作台和专用夹具上(带反锥的 V 形块或在水平面内移动的自定心 V 形块)。
VSMPO - AVISMA Corporation
VSMPO - AVISMA 公司
Technical Requirements  技术要求 Sheet 8 of 24
第 8 页,共 24 页
No. 21 012 2025 21 012 2025 21-012-202521-012-2025  编号 21 012 2025 21 012 2025 21-012-202521-012-2025
VSMPO - AVISMA Corporation Technical Requirements Sheet 8 of 24 No. 21-012-2025 | VSMPO - AVISMA Corporation | Technical Requirements | Sheet 8 of 24 | | :---: | :---: | :---: | | | No. $21-012-2025$ | |

4.3 Electrical equipment.
4.3 电气设备。

4.3.1 The control system shall be implemented on a programmable logic controller SIMATIK S7-1200 from SIEMENS, operator panel SIMATIK KP700 Comfort or their modern analogues - as agreed with the Customer at the stage of providing a technical and commercial proposal.
4.3.1 控制系统应采用西门子(SIEMENS)可编程逻辑控制器 SIMATIK S7-1200,操作面板为 SIMATIK KP700 Comfort 或其现代同类产品——具体型号应在提供技术和商业方案阶段与客户协商确定。

4.3.2 SINAMICS S120 Digital drives manufactured by SIEMENS shall be used as electric drives for movement along the machine coordinates, electric motors manufactured by SIEMENS or their modern analogues - as agreed with the Customer at the stage of providing a technical and commercial proposal. The machine shall have separate drives on all axes of movement.
4.3.2 作为沿机器坐标运动的电动驱动,应使用西门子(SIEMENS)生产的 SINAMICS S120 数字驱动器,电动机应为西门子生产的电机或其现代同类产品——具体型号应在提供技术和商业方案阶段与客户协商确定。机器所有运动轴均应配备独立驱动。

4.3.3 Use sensors built into electric motors as position sensors based on machine coordinates.
4.3.3 使用内置于电动机中的传感器作为基于机器坐标的位置传感器。

4.3.4 Electrical cabinets with climate control system and local lighting shall be by Rittal, protection rating - IP-54 as per GOST 17494-87. .
4.3.4 配备气候控制系统和局部照明的电气柜应采用 Rittal 品牌,防护等级按 GOST 17494-87 标准为 IP-54。

4.3.5 5 Provide a portable control panel from SIEMENS, and it shall have a degree of protection of at least IP65 and be equipped with a mushroom-type emergency shutdown button. The power cord of the portable remote control shall be bundled up or reeled in when at rest. Provide “clamped and unclamped” buttons on the remote control to change tools.
4.3.5 提供一台来自 SIEMENS 的便携式控制面板,其防护等级至少为 IP65,并配备蘑菇型紧急停机按钮。便携式遥控器的电源线在闲置时应捆绑或卷绕。遥控器上应设有“夹紧”和“松开”按钮以更换工具。

4.3.6 Power supply network requirement:
4.3.6 电源网络要求:
Voltage  电压 3 phases  三相 380 V  380 伏
Voltage fluctuation  电压波动 + / 10 % + / 10 % +//-10%+/-10 \%
Frequency  频率 50 Hz  50 赫兹
Supply voltage of control circuits
控制电路的供电电压
24 V.  24 伏。
Voltage 3 phases 380 V Voltage fluctuation +//-10% Frequency 50 Hz Supply voltage of control circuits 24 V. | Voltage | 3 phases | 380 V | | :--- | :--- | :--- | | Voltage fluctuation | $+/-10 \%$ | | | Frequency | 50 Hz | | | Supply voltage of control circuits | 24 V. | |
4.3.7 All wires shall be terminated; cords and cables shall be individually marked. Marking of wires and cables shall be done using standard marking means. Marking with ink on PVC tube is not allowed. Non- standard cords and cables shall be described in the documentation with attached connector wiring (drawings). All cable products shall be laid in cable ducts or tracks. Provide a reserve of lengths connected to the control cabinet of electrical routes of at least 1.5 meters.
4.3.7 所有导线应进行端接;电线和电缆应单独标记。导线和电缆的标记应使用标准标记方式。禁止在 PVC 管上用墨水标记。非标准电线和电缆应在文档中描述,并附有连接器接线图(图纸)。所有电缆产品应敷设在电缆槽或电缆桥架内。电气线路连接到控制柜时,应预留至少 1.5 米的长度余量。

4.3.8 Remote controls (consoles, monitor, etc.) shall be connected using connectors.
4.3.8 远程控制装置(控制台、监视器等)应使用连接器连接。

4.3.9 Documentation for the drives shall be provided in Russian.
4.3.9 驱动装置的文档应提供俄文版本。

4.3.10 Power circuits and control circuits (signal circuits) shall be separated.
4.3.10 电源回路和控制回路(信号回路)应分开。

4.3.11 Provide protection devices against pulse interference on the input and operational circuits.
4.3.11 在输入和操作电路上提供防脉冲干扰的保护装置。

4.3.12 Place the control panel on a traveling column and make it rotatable. The control panel shall be placed as agreed with the Customer.
4.3.12 将控制面板安装在移动立柱上,并使其可旋转。控制面板的放置位置应与客户协商确定。

4.3.13 On the remote control, place a control panel and control buttons for turning on the operational circuits of the machine, hydraulic station, spindle and control buttons for moving the machine along the specified coordinates and a mushroom-type emergency shutdown button.
4.3.13 在远程控制器上设置控制面板和用于开启机器操作电路、液压站、主轴的控制按钮,以及用于沿指定坐标移动机器的控制按钮和蘑菇型紧急停机按钮。

4.3.14 The location of the equipment on the control panel shall be previously agreed with the Customer.
4.3.14 控制面板上设备的位置应事先与客户协商确定。
VSMPO - AVISMA Corporation
VSMPO - AVISMA 公司
Technical Requirements  技术要求 Sheet 9 of 24
第 9 页,共 24 页
No. 21 012 2025 21 012 2025 21-012-202521-012-2025  编号 21 012 2025 21 012 2025 21-012-202521-012-2025
VSMPO - AVISMA Corporation Technical Requirements Sheet 9 of 24 No. 21-012-2025 | VSMPO - AVISMA Corporation | Technical Requirements | Sheet 9 of 24 | | :---: | :---: | :---: | | | No. $21-012-2025$ | |

4.3.15 Lamp for lighting the cutting area with a luminous flux of 500 lx in the horizontal plane.
4.3.16 Where the alternative manufacturer's products are used for control system and electric drives, the Contractor shall provide all necessary software and hardware diagnostic tools (development framework, commented project, configuration files, communication cables etc.).
4.3.15 用于照明切割区域的灯,水平面光通量为 500 lx。4.3.16 当控制系统和电动驱动采用替代制造商产品时,承包商应提供所有必要的软件和硬件诊断工具(开发框架、带注释的项目、配置文件、通信电缆等)。

4.4 Software requirements.
4.4 软件要求。

4.4.1 PLC software shall ensure monitoring and control over all actuators and machine units in manual, automatic and semi-automatic modes:
4.4.1 PLC 软件应确保在手动、自动和半自动模式下对所有执行器和机床单元进行监控和控制:

a) performing movements of machine coordinates and electrical automation functions according to operator commands in manual mode;
a) 根据操作员命令,在手动模式下执行机床坐标的运动和电气自动化功能;

b) automatic drilling of the centering hole (determining the center of the workpiece, referencing to the end face, drilling in automatic mode);
b) 自动钻中心孔(确定工件中心,参考端面,自动模式钻孔);

c) performing drilling operations of the centering hole in semi-automatic mode according to the operator’s commands;
c) 根据操作员指令以半自动模式进行中心孔钻孔操作;

d) generation of alarms for engineering and process emergencies and failures;
d) 生成工程和工艺紧急情况及故障报警;

e) control of machine loading time.
e) 控制机器装载时间。

4.4.2 The source code of the PLC software shall meet the following requirements:
4.4.2 PLC 软件的源代码应满足以下要求:

a) blocks and functions shall be open and password-less;
a) 块和函数应开放且无密码保护;

b) comments (making approximately at least 30 % 30 % 30%30 \% of the source code).
b) 注释(约占源代码的至少 30 % 30 % 30%30 \% )。

4.4.3 Operator’s control panel shall display the following information on the status of the control system and the machine:
4.4.3 操作员控制面板应显示以下关于控制系统和机器状态的信息:

a) machine operating mode (spindle RPM, feed rate, mm / min mm / min mm//min\mathrm{mm} / \mathrm{min}, cutting speed, m / min m / min m//min\mathrm{m} / \mathrm{min}, etc.);
a) 机器运行模式(主轴转速、进给速度、 mm / min mm / min mm//min\mathrm{mm} / \mathrm{min} 、切削速度、 m / min m / min m//min\mathrm{m} / \mathrm{min} 等);

b) status of machine PLC i/o;
b) 机器 PLC 输入/输出状态;

c) status of PLC internal signals;
c) PLC 内部信号状态;

d) parameter view and edit mode;
d) 参数查看和编辑模式;

e) warning and emergency messages displayed in Russian;
e) 以俄语显示的警告和紧急消息;

f) loads on electric motors;
f) 电动机负载;

g) diagnostic information on the algorithms of machine PLC;
g) 机器 PLC 算法的诊断信息;

h) log of emergency shut downs and alarm messages (min 200 entries);
h) 紧急停机和报警消息日志(至少 200 条记录);

i) information on machine loading, total time of machine on-load operation for a period of 24 hours divided by shifts, total operation time for a month, the information storage period is 1 year.
i) 机器负载信息,24 小时内按班次划分的机器负载运行总时间,月度总运行时间,信息存储期限为 1 年。

4.4.4 The electrical automation program of the machine (PLC) in the form of a commented Step 7 project (TIA-Portal), as well as the visualization of the HMI panel in the form of a WinCC project, shall be transmitted to the Customer after completion of commissioning.
4.4.4 机器的电气自动化程序(PLC),以带注释的 Step 7 项目(TIA-Portal)形式,以及 HMI 面板的可视化项目,以 WinCC 项目形式,应在调试完成后交付给客户。

4.4.5 Licenses for installed software, connected options, technological cycles and other extensions shall be transferred to the Customer.
4.4.5 已安装软件、连接选项、工艺循环及其他扩展的许可证应转交给客户。
VSMPO - AVISMA Corporation
VSMPO - AVISMA 公司
Technical Requirements  技术要求 Sheet 10 of 24
第 10 页,共 24 页
No. 21 012 2025 21 012 2025 21-012-202521-012-2025  编号 21 012 2025 21 012 2025 21-012-202521-012-2025
VSMPO - AVISMA Corporation Technical Requirements Sheet 10 of 24 No. 21-012-2025 | VSMPO - AVISMA Corporation | Technical Requirements | Sheet 10 of 24 | | :---: | :---: | :---: | | | No. $21-012-2025$ | |

4.5 Safety requirements  4.5 安全要求

4.5.1 All legends on cabinets and consoles shall be in Russian.
4.5.1 所有机柜和控制台上的标识应为俄语。

4.5.2 Wire insulation color codes shall be in accordance with GOST R MEK 60204-12007:
4.5.2 导线绝缘颜色代码应符合 GOST R MEK 60204-1:2007 标准:
  • BLACK for AC and DC power circuits;
    交流和直流电源电路为黑色;
  • RED for AC control circuits;
    交流控制电路为红色;
  • BLUE for DC control circuits;
    蓝色用于直流控制电路;
  • ORANGE for circuits remaining energized when the input circuit breaker is turned off;
    橙色用于输入断路器关闭时仍保持通电的电路;
  • GREEN - YELLOW for protective wire.
    绿-黄色用于保护线。

    4.5.3 Arrange the palm buttons for emergency shutdown of the machine at all service points (operator’s control panel, remote control console, control cabinet, local panels etc.). Make emergency shutdown in a safety circuit independent from the PLC of the machine. Triggering of the emergency shutdown circuit should lead to tripping of the electrical cabinet’s input circuit breaker. The control system and lighting of the electrical cabinet are powered up to the input circuit breaker. Ensure the time required to stop the machinery.
    4.5.3 在所有服务点(操作员控制面板、远程控制台、控制柜、本地面板等)布置机器紧急停机的掌上按钮。紧急停机应设置在独立于机器 PLC 的安全电路中。触发紧急停机电路应导致电气柜输入断路器跳闸。控制系统和电气柜照明的电源由输入断路器供电。确保有足够时间使机械停止运行。

    4.5.4 Provide for the interlocks for opening of control cabinet doors, switching on the control cabinet lightning and switching off the climate control.
    4.5.4 提供控制柜门开启联锁装置,控制柜照明的开启以及气候控制的关闭。

    4.5.5 Ensure safe operation of the machine by installing the required protection safeguard with electrical (mechanical) lock-up.
    4.5.5 通过安装带有电气(机械)锁定的必要保护装置,确保机器的安全运行。

    4.5.6 Noise emission shall be maximum 80 dB ( A ) 80 dB ( A ) 80dB(A)80 \mathrm{~dB}(\mathrm{~A}).
    4.5.6 噪声排放最大值为 80 dB ( A ) 80 dB ( A ) 80dB(A)80 \mathrm{~dB}(\mathrm{~A})

    4.5.7 Ground the machine, electrical equipment, and control panels in accordance with GOST 12.1.030 Electric safety. Protective conductive earth, neutralling. Indicate grounding connection points in accordance with GOST 21130-75 Earth terminals and earth signs.
    4.5.7 按照 GOST 12.1.030《电气安全。保护性导电接地,中性接地》对机器、电气设备和控制面板进行接地。根据 GOST 21130-75《接地端子和接地标志》标明接地连接点。

    4.5.8 Furnish the electrical equipment with electrical safety warning and information plates. All legends on the plates and controls shall be in Russian.
    4.5.8 为电气设备配备电气安全警告和信息标牌。所有标牌和控制装置上的文字均应为俄文。

    4.5.9 Cleaning, priming and painting of the machine shall be according to GOST 2213386. The external faces of assembly units of the spindle headstock and table that extend far beyond the dimensions of the bed and pose a threat of injury shall be painted according to GOST 12.2.009, par.6.4.
    4.5.9 机器的清洁、底漆和涂漆应符合 GOST 2213386 标准。主轴箱和工作台的装配单元外表面若超出床身尺寸且存在受伤风险,应按照 GOST 12.2.009 第 6.4 条进行涂漆。

4.6 Additional machine options:
4.6 机器附加选项:

4.6.1 Design, manufacture and install a universal fixture (a V-block with a reverse cone or self-centering V-blocks moving in a horizontal plane) into which the bar is placed (dimensions
4.6.1 设计、制造并安装一个通用夹具(带有反锥或在水平面内移动的自定心 V 型块的 V 型块),用于放置棒材(尺寸
VSMPO - AVISMA Corporation
VSMPO - AVISMA 公司
Technical Requirements  技术要求 Sheet 11 of 24
第 11 页,共 24 页
No. 21 012 2025 21 012 2025 21-012-202521-012-2025  编号 21 012 2025 21 012 2025 21-012-202521-012-2025
VSMPO - AVISMA Corporation Technical Requirements Sheet 11 of 24 No. 21-012-2025 | VSMPO - AVISMA Corporation | Technical Requirements | Sheet 11 of 24 | | :---: | :---: | :---: | | | No. $21-012-2025$ | |
of the workpieces in paragraph 3.2). The fixture is installed on the machine table. This fixture will allow clamping and centrally installing bars of all diameters in both horizontal and vertical planes. The design of the fixture shall be agreed with the Customer.
工件见第 3.2 段)。夹具安装在机床工作台上。该夹具可实现对所有直径的棒材在水平和垂直平面上的夹紧和中心安装。夹具的设计应与客户协商确定。

4.6.2 The machine shall be equipped with a bar support for centering bars with a length of more than 3000 mm . The support shall be movable (not attached to the foundation or floor) and have a reverse cone for stacking bars. The cone of the V-block on the table shall be of the same geometry as the cone on the support. The cones shall be at the same height with each other (Appendices No. 1 and No. 2).
4.6.2 机床应配备用于定位长度超过 3000 毫米棒材的支撑装置。该支撑装置应为可移动式(不固定于基础或地面),并设有用于堆放棒材的反向锥体。工作台上的 V 型块锥体应与支撑装置上的锥体几何形状相同。两个锥体应处于同一高度(见附录 1 和附录 2)。

4.6.3 A device for finding the center of a bar (on a processed or an unprocessed) (specified in paragraph 3.2).
4.6.3 用于寻找棒材中心的装置(适用于已加工或未加工的棒材)(详见第 3.2 段)。

5 Operational Requirements
5 操作要求

Electric power:  电力:
Power-supply system … . TN-C-S
供电系统……TN-C-S

Voltage  电压
3 phases 380 V
三相 380 V

Voltage fluctuation  电压波动
+/- 10 %  +/- 10%
Three-phase current frequency, Hz … . 50
三相电流频率,赫兹 … 50

Lighting voltage, V … 24
照明电压,伏特 … 24

Control circuit voltage, V … 24
控制电路电压,V … 24

Degree of protection of electrical equipment and automation … min. IP54
电气设备及自动化保护等级 … 最低 IP54

Installation operating mode … three-shift continuous
安装运行模式 … 三班连续

5.1 Fuel requirements: no.
5.1 燃料要求:无。

5.2 Requirements for mechanization systems:
5.2 机械化系统的要求:

5.2.1 By agreement with the Customer.
5.2.1 需与客户协商确定。

5.3 Tool and tooling requirements:
5.3 工具和工装的要求:

5.3.1 Kitting of adapter spindles: 10 pcs.
5.3.1 适配器主轴的配套数量:10 件。

5.4 Requirements for the composition of spare and quick-wear parts (SPTA (spare parts, tools and accessories):
5.4 备件和易损件(SPTA(备件、工具及附件))组成要求:

5.4.1 The manufacturer offers and coordinates with the Customer a list of SPTA, taking into account the long production time and the criticality of the failure of the replaced parts to operate the machine.
5.4.1 制造商应根据生产周期长短及被更换零件故障对设备运行的重要性,向客户提供并协商 SPTA 清单。

5.4.2 The machine SPTA shall include consumables necessary for commissioning and uninterrupted operation during the warranty period of the machine after its commissioning.
5.4.2 设备的 SPTA 应包括调试及设备调试后保修期内持续运行所需的消耗品。

5.4.3 Additionally, the entire set of quick-wear spare parts (a set of general mechanical rubber goods seals) is included in the delivery package.
5.4.3 此外,交付包中应包含整套易损备件(通用机械橡胶制品密封件套装)。

5.4.4 The cost of the SPTA is paid separately from the cost of the equipment.
5.4.4 SPTA 的费用与设备费用分开支付。
VSMPO - AVISMA Corporation
VSMPO - AVISMA 公司
Technical Requirements  技术要求 Sheet 12 of 24
第 12 页,共 24 页
No. 21 012 2025 21 012 2025 21-012-202521-012-2025  编号 21 012 2025 21 012 2025 21-012-202521-012-2025
VSMPO - AVISMA Corporation Technical Requirements Sheet 12 of 24 No. 21-012-2025 | VSMPO - AVISMA Corporation | Technical Requirements | Sheet 12 of 24 | | :---: | :---: | :---: | | | No. $21-012-2025$ | |
5.5 Requirements for safety and emergency shutdown systems:
5.5 安全及紧急停机系统的要求:

5.5.1 In terms of operational safety, the machine shall meet the requirements of the following normative documents: GOST 25861-83, Electric Installation Code, requirements of the Interindustry Rules on Labor Safety by Cold Metalworking POT RM 006-97 006-97 and GOST 12.2.009 “Metal-working machines. General safety requirements”. Railings, platforms for maintenance and repair, and stairs shall comply with the requirements of the “Rules on Occupational safety when working at height.”
5.5.1 在操作安全方面,机器应符合以下规范性文件的要求:GOST 25861-83、电气装置规范、行业间冷加工劳动安全规则 POT RM 006-97 006-97 及 GOST 12.2.009《金属加工机床 一般安全要求》。栏杆、维修和检修平台及楼梯应符合《高处作业安全规程》的要求。

5.5.2 When designing and manufacturing equipment, exclude signs of work at height for repair and maintenance personnel. Provide fenced repair sites.
5.5.2 在设备设计和制造时,应避免维修和保养人员进行高处作业。应设置有围栏的维修场所。

5.5.3 All external energized elements of the system hardware shall have the protection against accidental contact; the hardware itself shall have protective grounding in accordance with GOST 12.1.030-81 and Electric Installation Code. Indicate grounding connection points in accordance with GOST 21130-75 Earth terminals and earth signs.
5.5.3 系统硬件的所有外部带电元件应具备防止意外接触的保护;硬件本身应按照 GOST 12.1.030-81 和电气装置规范进行保护接地。接地连接点应按照 GOST 21130-75《接地端子和接地标志》进行标示。

5.5.4 During the installation, maintenance and operation of the machine hardware, the Electrical Installations Code (EIC), “Rules for the Technical operation of Electrical installations of Consumers”, and the requirements of the operating instructions for individual technical means included in the machine hardware shall be observed.
5.5.4 在机器硬件的安装、维护和运行过程中,应遵守《电气装置规范》(EIC)、《用户电气装置技术运行规则》以及机器硬件中包含的各个技术设备操作说明的要求。

5.5.4 Arrange the palm buttons for emergency shutdown of the machine at all service points (operator’s control panel, remote control console, control cabinet, local panels etc.). Make emergency shutdown in a safety circuit independent from the PLC of the machine. Triggering of the emergency shutdown circuit should lead to tripping of the electrical cabinet’s input circuit breaker. The control system and lighting of the electrical cabinet are powered up to the input circuit breaker. Ensure the time required to stop the machinery.
5.5.4 在所有服务点(操作员控制面板、远程控制台、控制柜、本地面板等)布置紧急停机的掌上按钮。紧急停机应在独立于机器 PLC 的安全回路中实现。触发紧急停机回路应导致电气柜输入断路器跳闸。控制系统和电气柜照明的供电至输入断路器。确保机械停止所需的时间。

5.5.6 Provide for the interlocks for opening of control cabinet doors, switching on the control cabinet lightning and switching off the climate control.
5.5.6 设定控制柜门开启联锁、控制柜照明开启及空调关闭的联锁装置。

5.5.7 Ensure safe operation of the machine by installing the required protection safeguard with electrical (mechanical) lock-up.
5.5.7 通过安装带有电气(机械)锁定的必要保护装置,确保机器的安全运行。

5.5.8 Provide for blocking the movement of machine coordinates when the spindle rotations stop.
5.5.8 在主轴停止旋转时,设置阻止机器坐标移动的装置。
VSMPO - AVISMA Corporation
VSMPO - AVISMA 公司
Technical Requirements  技术要求 Sheet 13 of 24
第 13 页,共 24 页
No. 21 012 2025 21 012 2025 21-012-202521-012-2025  编号 21 012 2025 21 012 2025 21-012-202521-012-2025
VSMPO - AVISMA Corporation Technical Requirements Sheet 13 of 24 No. 21-012-2025 | VSMPO - AVISMA Corporation | Technical Requirements | Sheet 13 of 24 | | :---: | :---: | :---: | | | No. $21-012-2025$ | |
5.5.9 The complex (machine) shall be designed in such a way that the location of its components guarantees convenient and safe access for employees during maintenance and repairs.
5.5.9 该设备(机器)应设计成其部件的位置保证员工在维护和修理时能够方便且安全地接近。

5.5.10 Furnish the electrical equipment with electrical safety warning and information plates. All legends on the plates and controls shall be in Russian.
5.5.10 电气设备应配备电气安全警示和信息标牌。所有标牌和控制装置上的文字应为俄语。

5.6 Requirements for other systems and equipment components:
5.6 其他系统和设备部件的要求:

5.6.1 Technical means that meet the following standards in terms of resistance to external influences shall be used in the system (machine):
5.6.1 系统(机器)中应使用符合以下标准的技术手段,以抵抗外部影响:
  • GOST 21552-84 - for computer technique ;
    GOST 21552-84 - 计算机技术用;
  • GOST 12997-84 - for industrial devices and means of automatization;
    GOST 12997-84 - 工业设备及自动化装置用;
  • GOST 14254-96 - for enclosures, electrical products.
    GOST 14254-96 - 外壳、电气产品用。

    5.6.2 The machine’s design shall ensure continuous round-the-clock operation with specified technical parameters and not require adjustment after shutdown, including with power off.
    5.6.2 机器的设计应确保连续全天候运行,满足规定的技术参数,且在停机后(包括断电情况下)无需调整。

    5.6.3 Microcircuits and semiconductor elements must be protected from the destructive effects of static electricity.
    5.6.3 微电路和半导体元件必须防止静电的破坏性影响。

    5.6.4 Electrical equipment shall be able to operate within company power network:
    5.6.4 电气设备应能在公司电力网络内运行:
  • three-phase AC voltage 380 V ;
    三相交流电压 380 V;
  • the permissible deviation of the mains voltage is + 10 % , 15 % + 10 % , 15 % +10%,-15%+10 \%,-15 \%;
    电网电压的允许偏差为 + 10 % , 15 % + 10 % , 15 % +10%,-15%+10 \%,-15 \%
  • the nominal frequency of the supply network is 50 Hz ;
    电网的额定频率为 50 Hz;
  • permissible deviations of the network frequency ± 2.5 % ± 2.5 % +-2.5%\pm 2.5 \%.
    电网频率的允许偏差 ± 2.5 % ± 2.5 % +-2.5%\pm 2.5 \%

    5.6.7 The machine hardware maintenance and repair regulations are determined by the reliability requirements of the system (machine).
    5.6.7 机器硬件的维护和修理规定由系统(机器)的可靠性要求决定。

    5.6.8 Lighting of the processing area and maintenance areas in accordance with of GOST 12.2.009-99, para. 4.3. Lighting shall be designed using LED lamps.
    5.6.8 加工区和维护区的照明应符合 GOST 12.2.009-99 第 4.3 条的规定。照明应采用 LED 灯设计。

    5.8.9 Noise emission shall be maximum 80 dB ( A ) 80 dB ( A ) 80dB(A)80 \mathrm{~dB}(\mathrm{~A}).
    5.8.9 噪声排放最大值应为 80 dB ( A ) 80 dB ( A ) 80dB(A)80 \mathrm{~dB}(\mathrm{~A})
VSMPO - AVISMA Corporation
VSMPO - AVISMA 公司
Technical Requirements  技术要求 Sheet 14 of 24
第 14 页,共 24 页
No. 21 012 2025 21 012 2025 21-012-202521-012-2025  编号 21 012 2025 21 012 2025 21-012-202521-012-2025
VSMPO - AVISMA Corporation Technical Requirements Sheet 14 of 24 No. 21-012-2025 | VSMPO - AVISMA Corporation | Technical Requirements | Sheet 14 of 24 | | :---: | :---: | :---: | | | No. $21-012-2025$ | |

6 Requirements for methods and conditions of monitoring
6 监测方法和条件的要求

6.1 Requirements for metrological assurance and measuring instruments: Not required
6.1 计量保证和测量仪器的要求:不要求

6.2 Requirements for data recording and storage:
6.2 数据记录和存储的要求:
All primary information about the progress of the technological process shall be stored in the DPA information and diagnostic system used at VSMPO.
所有关于工艺过程进展的主要信息应存储在 VSMPO 使用的 DPA 信息与诊断系统中。

6.2.1 Requirements for CNC computer workstation:
6.2.1 数控计算机工作站的要求:

6.3 Software requirements
6.3 软件要求
The HMI program of the operator’s CNC computer workstation shall ensure the following:
操作员数控计算机工作站的人机界面程序应确保以下内容:

6.3.1 Report files shall be stored throughout the entire life cycle of the automated control system on the operator’s CNC computer workstation, and shall also be automatically copied and stored on the customer’s server.
6.3.1 报告文件应在自动控制系统的整个生命周期内存储于操作员的数控计算机工作站上,并且应自动复制并存储在客户的服务器上。

6.3.2 Generation of a single-page or multi-page report for each operation carried out with metal. Reports conducted with the same metal shall be easily traceable, for example, a multipage report shall have one identification number on each page, and file names shall have a common identifier and an individual variable part for each operation.
6.3.2 针对每次金属加工操作生成单页或多页报告。使用相同金属进行的报告应易于追踪,例如,多页报告的每一页应有相同的识别编号,文件名应包含共同的标识符及每次操作的独立变量部分。

6.3.3 The HMI program shall be fully agreed with the Customer before the final tests are carried out.
6.3.3 HMI 程序应在进行最终测试前与客户充分协商一致。

6.3.4 The software must be supplied on an installation disk, with attached project archives of all programmable devices, with step-by-step instructions for installation and activation.
6.3.4 软件必须以安装光盘形式提供,附带所有可编程设备的项目档案,以及逐步的安装和激活说明。

6.3.5 PLC software shall ensure:
6.3.5 PLC 软件应确保:
  • monitor and control of all actuators and aggregates in manual mode (control from local consoles);
    手动模式下对所有执行器和装置的监控和控制(来自本地控制台的控制);
  • calculation of calculated parameters;
    计算计算参数;
  • measurement and conversion of measured values;
    测量和转换测量值;
  • generation of alarms for engineering and process emergencies and failures.
    生成工程和工艺紧急情况及故障的报警。

    6.3.6 The source code of the PLC software shall meet the following requirements:
    6.3.6 PLC 软件的源代码应满足以下要求:
  • blocks and functions are open and password-less;
    模块和功能是开放的且无密码;
  • comments (making approximately at least 30 % 30 % 30%30 \% of the source code).
    注释(约占源代码的 30 % 30 % 30%30 \% )。
VSMPO - AVISMA Corporation
VSMPO - AVISMA 公司
Technical Requirements  技术要求 Sheet 15 of 24
第 15 页,共 24 页
No. 21 012 2025 21 012 2025 21-012-202521-012-2025  编号 21 012 2025 21 012 2025 21-012-202521-012-2025
VSMPO - AVISMA Corporation Technical Requirements Sheet 15 of 24 No. 21-012-2025 | VSMPO - AVISMA Corporation | Technical Requirements | Sheet 15 of 24 | | :---: | :---: | :---: | | | No. $21-012-2025$ | |
7.1.1 The materials and equipment (technical devices) provided in the projects shall be certified.
7.1.1 项目中提供的材料和设备(技术装置)应具备认证。

7.2 Environmental requirements:
7.2 环境要求:

7.2.1 The system technology shall be designed for operation under the following conditions (Building standards SN 512-78):
7.2.1 系统技术应设计为在以下条件下运行(建筑标准 SN 512-78):
  • Ambient temperature: … from + 10 0 + 10 0 +10^(0)+10^{0} to + 40 0 C + 40 0 C +40^(0)C+40^{0} \mathrm{C}
    环境温度:… 从 + 10 0 + 10 0 +10^(0)+10^{0} + 40 0 C + 40 0 C +40^(0)C+40^{0} \mathrm{C}
  • Air humidity without condensation of moisture, max.: … 80%
    空气湿度(无水分凝结),最大值:… 80%
  • Dustiness of the air, max.: … 0 , 8 mg / 0 , 8 mg / 0,8mg//0,8 \mathrm{mg} / cubic meter
    空气尘埃度,最大值:… 0 , 8 mg / 0 , 8 mg / 0,8mg//0,8 \mathrm{mg} / 立方米
  • Vibrations, max.: … 0,1 g, (up to 500 Hz )
    振动,最大值:… 0.1 g,(频率最高至 500 Hz)

8. Requirements for Technical (Supply) Documentation
8. 技术(供应)文件的要求

8.1 Equipment certificate:
8.1 设备证书:

8.1.1 The Contractor shall develop a complete set of design documentation in accordance with GOST 2.102-68 “Unified system for design documentation. Types and sets of design documentations”.
8.1.1 承包商应根据 GOST 2.102-68《统一设计文件系统。设计文件的类型和套数》编制完整的设计文件。

8.1.2 When performing design work, the main technical solutions (basic, electrical, wiring diagrams, specifications) shall be agreed with the Customer’s specialists.
8.1.2 在进行设计工作时,主要技术方案(基础方案、电气方案、接线图、规格书)应与客户的专家协商一致。

8.1.3 Schematic diagrams and layout solutions shall be approved by the Customer at the appropriate design stage.
8.1.3 原理图和布置方案应在相应的设计阶段由客户批准。

8.1.4 The following documentation shall be provided within the framework of the project:
8.1.4 在项目框架内应提供以下文件:

a) Certificate.  a) 证书。
b) Operator manual.  b) 操作手册。
c) The operating manual, which contains:
c) 包含以下内容的操作说明书:
  • Consumption table of lubricants and oils;
    润滑剂和油品消耗表;
  • Specification of the components used, indicating the type and manufacturer;
    所用组件的规格说明,注明类型和制造商;
  • Specification for seals and O-rings;
    密封件和 O 型圈的规格说明;
  • A list of possible malfunctions and methods of their elimination;
    可能的故障列表及其排除方法;
  • Maintenance instructions;
    维护说明;
  • General drawings of assembly units;
    总成单元的总体图;
  • Drawings of quick-wear parts;
    易损件图纸;
  • Lubrication schemes and maps;
    润滑方案和图示;
  • Drawings of piping and methods of its fastening;
    管道图纸及其固定方法;
  • The wiring diagram of the pneumatic air ducts;
    气动风管的接线图;
  • Drawings of the construction assignment for the foundation.
    基础施工任务的图纸。

    d) Technical documentation for the electrics shall be developed in compliance with the requirements of GOST IEC 60204-1-99, GOST 7599, GOST 12.2.009.
    d) 电气技术文件应按照 GOST IEC 60204-1-99、GOST 7599、GOST 12.2.009 的要求编制。

    8.1.5 All the documents developed by the Contractor shall be in Russian.
    8.1.5 承包商编制的所有文件应为俄文。

    8.1.6 Technical documentation shall be provided to the Customer in 3 hard copies and in electronic format on USB-media in 1 copy.
    8.1.6 技术文件应以 3 份纸质版和 1 份电子版(USB 介质)提供给客户。

    8.2 Certificates for components included in the equipment:
    8.2 设备中包含的组件的证书:
VSMPO - AVISMA Corporation
VSMPO - AVISMA 公司
Technical Requirements  技术要求 Sheet 16 of 24
第 16 页 共 24 页
No. 21 012 2025 21 012 2025 21-012-202521-012-2025  编号 21 012 2025 21 012 2025 21-012-202521-012-2025
VSMPO - AVISMA Corporation Technical Requirements Sheet 16 of 24 No. 21-012-2025 | VSMPO - AVISMA Corporation | Technical Requirements | Sheet 16 of 24 | | :---: | :---: | :---: | | | No. $21-012-2025$ | |
VSMPO - AVISMA Corporation
VSMPO - AVISMA 公司
Technical Requirements  技术要求 Sheet 17 of 24
第 17 页,共 24 页
No. 21 012 2025 21 012 2025 21-012-202521-012-2025  编号 21 012 2025 21 012 2025 21-012-202521-012-2025
VSMPO - AVISMA Corporation Technical Requirements Sheet 17 of 24 No. 21-012-2025 | VSMPO - AVISMA Corporation | Technical Requirements | Sheet 17 of 24 | | :---: | :---: | :---: | | | No. $21-012-2025$ | |
8.6.10 the machine PLC program in the form of a commented project, in an electronic form on CD-ROM media or on a USB-Flash drive;
8.6.10 机器 PLC 程序,以带注释的项目形式,电子版存储于光盘或 USB 闪存驱动器中;

8.6.12 Description of alarms (emergency messages) and their elimination methods.
8.6.12 报警(紧急信息)的描述及其消除方法。

8.6.12 The complete set of drawings, specifications and diagrams developed by the Contractor.
8.6.12 承包商编制的完整图纸、规格和图表。

8.6.13 Where the alternative manufacturer’s PLC is used for control system, the necessary documents for programming and diagnostics shall be agreed with the Customer on an individual basis.
8.6.13 当控制系统采用替代制造商的 PLC 时,编程和诊断所需的相关文件应与客户单独协商确定。

9 Personnel Training Requirements:
9 人员培训要求:

9.1 The Contractor shall familiarize (train) Customer’s specialists during 20 hours with the following topics:
9.1 承包商应对客户的专家进行 20 小时的培训,内容包括以下主题:

9.1.1 Set-up engineer, mechanical engineer (fitter) and electrical engineer :
9.1.1 安装工程师、机械工程师(装配工)和电气工程师:
  • machine design and location of basic modules;
    机器设计及基本模块的位置;
  • location and functions of control elements;
    控制元件的位置和功能;
  • machine operating modes;
    机器操作模式;
  • functions of machine magnetics (per PLC program);
    机器磁性功能(根据 PLC 程序);
  • maintenance.  维护。
  • troubleshooting;  故障排除;
  • machine troubleshooting methods;
    机器故障排除方法;

    9.1.2 Programmer engineer, process engineer:
    9.1.2 程序工程师,工艺工程师:
  • machine design and location of basic modules;
    机器设计及基本模块的位置;
  • location and functions of control elements;
    控制元件的位置和功能;
  • machine operating modes;
    机器操作模式;
  • programming training (creating, entering, and working with a program);
    编程培训(创建、输入及使用程序);
  • functions of machine magnetics (per PLC program);
    机器磁性功能(根据 PLC 程序);
  • machine control;  机器控制;
  • operator’s actions in case of actuation of emergency protection and interlocks
    操作员在紧急保护和联锁动作时的操作
  • equipment performance restoration after replacing of electrics program.
    更换电气程序后设备性能的恢复

    9.1.3 Machine operator:  9.1.3 机器操作员:
  • machine design and location of basic modules;
    机器设计及基本模块的位置;
  • location and functions of control elements;
    控制元件的位置和功能;
  • machine operating modes;
    机器的操作模式;
  • operator’s actions in case of actuation of emergency protection and interlocks;
    紧急保护和联锁动作时操作员的应对措施;
  • shift-time status control and maintenance.
    班次期间的状态监控和维护。

    9.2 Customer’s personnel training shall take place within a designated time period separately from machine installation and setup.
    9.2 客户人员培训应在指定时间内进行,且与机器安装和调试分开进行。
VSMPO - AVISMA Corporation
VSMPO - AVISMA 公司
Technical Requirements  技术要求 Sheet 18 of 24
第 18 页,共 24 页
No. 21 012 2025 21 012 2025 21-012-202521-012-2025  编号 21 012 2025 21 012 2025 21-012-202521-012-2025
VSMPO - AVISMA Corporation Technical Requirements Sheet 18 of 24 No. 21-012-2025 | VSMPO - AVISMA Corporation | Technical Requirements | Sheet 18 of 24 | | :---: | :---: | :---: | | | No. $21-012-2025$ | |

10 Requirements for Installation and Commissioning:
10 安装和调试要求:

10.1 Installation and commissioning of equipment by the Contractor’s specialists at the Customer’s premises shall be provided in the contract.
10.1 设备的安装和调试由承包商的专业人员在客户现场进行,应在合同中予以规定。

10.2 Within 60 (sixty) calendar days from the date of contract signing the Contractor shall submit to the Customer in the Russian language a complete package of documents and a statement of resources required for machine installation and commissioning:
10.2 自合同签订之日起 60(日历)天内,承包商应向客户提交俄文版的完整文件包及机器安装和调试所需资源的说明:

10.2.1 Machine foundation drawings containing the requirements for load and vibration insulation including the drawings of foundation embedded elements with the elements not supplied together with the machine;
10.2.1 包含负载和振动隔离要求的机器基础图纸,包括基础埋件图纸,埋件不随机器一同供应;

10.2.2 Machine layout at “0” level;
10.2.2 “0”标高的机器布置图;

10.2.3 overall dimensions of the machine and auxiliary equipment, including the dimensions of extreme positions of travelling elements (if required);
10.2.3 机器及辅助设备的总体尺寸,包括行走部件极限位置的尺寸(如有要求);

10.2.4 Requirements for machine electric power supply: power connection points, machine power line requirements, installed machine power;
10.2.4 机器电力供应要求:电源接入点、机器电源线路要求、机器装机功率;

10.2.5 Requirements for machine compressed air supply, compressed air quality (contamination class according to GOST 17433-80 or ISO 85783.1), consumption, pressure, inlet points and dew point;
10.2.5 机器压缩空气供应的要求,压缩空气质量(根据 GOST 17433-80 或 ISO 8578-3.1 的污染等级)、消耗量、压力、进气点和露点;

10.2.6 Other information required for sound installation and commissioning of the machine.
10.2.6 机器正确安装和调试所需的其他信息。

10.3 The Customer shall ensure the availability of the load handling devices, tooling, lifting equipment required for installation.
10.3 客户应确保安装所需的负载搬运设备、工装和起重设备的可用性。

11 Requirements for Testing and Acceptance:
11 测试和验收的要求:

11.1. Testing is carried out according to the acceptance testing program developed by the Contractor and agreed with the Customer.
11.1. 测试按照承包商制定并与客户协商一致的验收测试方案进行。

11.2. Primary tests are carried out on the territory of the Contractor.
11.2. 初步测试在承包商所在地进行。

11.2.1. The scope of work during the primary tests:
11.2.1. 初步测试期间的工作范围:

a) control of machine completeness and operational documentation.
a) 检查机器的完整性及操作文件。

b) testing of emergency protections and machine interlocks;
b) 紧急保护装置和机器联锁的测试;

c) testing the geometric accuracy of the machine;
c) 机器几何精度的测试;

d) positioning accuracy test;
d) 定位精度测试;

e) machine no-load testing for at least 4 hours;
e) 机器空载运行测试,时间不少于 4 小时;

f) electrical and mechanical units and modules heating control;
f) 电气和机械单元及模块的加热控制;

g) control of the functioning of all modes and functions of electrical automation;
g) 电气自动化所有模式和功能的运行控制;

h) testing the accuracy during manufacture of a part using a standard test program;
h) 使用标准测试程序对零件制造精度进行测试;

11.2.2. Acceptance of the machine is carried out by the Contractor’s Technical Inspection Department and representatives of the Customer. If the acceptance results are positive, a preliminary acceptance certificate for the machine is drawn up, and the results obtained are entered into the machine certificate.
11.2.2. 机器的验收由承包商技术检验部门和客户代表共同进行。如验收结果合格,出具机器的初步验收证书,并将获得的结果记录在机器证书中。
VSMPO - AVISMA Corporation
VSMPO - AVISMA 公司
Technical Requirements  技术要求 Sheet 19 of 24
第 19 页,共 24 页
No. 21 012 2025 21 012 2025 21-012-202521-012-2025  编号 21 012 2025 21 012 2025 21-012-202521-012-2025
VSMPO - AVISMA Corporation Technical Requirements Sheet 19 of 24 No. 21-012-2025 | VSMPO - AVISMA Corporation | Technical Requirements | Sheet 19 of 24 | | :---: | :---: | :---: | | | No. $21-012-2025$ | |
11.2.3. Materials, tools, measuring instruments for conducting primary tests shall be provided by the Contractor, the workpiece for producing the trial part shall be provided by the Contractor.
11.2.3. 进行初步测试所需的材料、工具、测量仪器由承包商提供,试制零件的工件由承包商提供。

11.3 Final tests on the Customer’s premises shall be carried out after installation, commissioning and final debugging of the machine.
11.3 最终测试应在客户现场进行,时间为机器安装、调试和最终调试完成后。

11.3.1. The scope of work during the final tests:
11.3.1. 最终测试期间的工作范围:

a) control of machine completeness and operational documentation;
a) 检查机器的完整性及操作文件;

b) testing of emergency protections and machine interlocks;
b) 紧急保护装置和机器联锁的测试;

c) testing the geometric accuracy of the machine;
c) 机器几何精度的测试;

d) positioning accuracy test;
d) 定位精度测试;

e) machine no-load testing for at least 8 hours;
e) 机器空载运行测试,时间不少于 8 小时;

f) electrical and mechanical units and modules heating control;
f) 电气和机械单元及模块的加热控制;

g) control of the functioning of all modes and functions of electrical automation;
g) 电气自动化所有模式和功能的运行控制;

h) testing the accuracy during manufacture of a part using a standard test program.
h) 使用标准测试程序对零件制造过程中的精度进行测试。

i) manufacture of a batch of parts ( 2 4 2 4 2-42-4 pcs.) of the Customer’s part range.
i) 生产一批客户零件系列的零件( 2 4 2 4 2-42-4 件)。

11.4 If the results of product acceptance are positive, a final acceptance certificate for the machine is issued, and the accuracy measurement results obtained are entered into the machine certificate.
11.4 如果产品验收结果为正面,将签发机器的最终验收证书,并将获得的精度测量结果录入机器证书中。

11.5 Materials for conducting final tests, measuring instruments and a workpiece for the manufacture of a trial batch of parts shall be provided by the Customer. The tests shall be carried out with cutting tools and tooling from both the Contractor and the Customer, to avoid disagreements.
11.5 进行最终测试所需的材料、测量仪器及试制零件批次的工件应由客户提供。测试应使用承包商和客户双方的切削工具和夹具进行,以避免分歧。

12 Warranty:  12 保修:

12.1 Warranty period of equipment operation (for completed works and accessories) shall be at least 24 months from the moment of commissioning from the date of signing the act of completed works at the Customer’s premises.
12.1 设备运行的保修期(针对已完成的工程和附件)应不少于自客户现场签署完工验收单之日起 24 个月的投产时间。

12.2 Lifespan of the lathe shall be at least 10 years with three-shift operation. The documents accompanying the equipment shall specify the lifespan of the supplied equipment set by the Contractor.
12.2 车床的使用寿命应不少于 10 年,按三班制运行。设备随附的文件应由承包商明确规定所供设备的使用寿命。
The Contractor shall ensure qualified customer support within the entire lifespan of the machine, including:
承包商应确保在机器整个使用寿命期间提供合格的客户支持,包括:

a) advisory support in technical issues relating to the machine operation;
a) 在机器操作相关的技术问题上提供咨询支持;

b) advisory support in the issues relating to equipment repair within the post-warranty period.
b) 在保修期后设备维修相关问题上提供咨询支持。

11 Special Requirements:
11 特殊要求:

VSMPO - AVISMA Corporation
VSMPO - AVISMA 公司
Technical Requirements  技术要求 Sheet 20 of 24
第 20 页,共 24 页
No. 21 012 2025 21 012 2025 21-012-202521-012-2025  编号 21 012 2025 21 012 2025 21-012-202521-012-2025
VSMPO - AVISMA Corporation Technical Requirements Sheet 20 of 24 No. 21-012-2025 | VSMPO - AVISMA Corporation | Technical Requirements | Sheet 20 of 24 | | :---: | :---: | :---: | | | No. $21-012-2025$ | |
The machine’s design should ensure continuous round-the-clock operation ( 22.5 hours a day) with specified technical parameters and not require adjustment after shutdown, including with power off.
机器的设计应确保连续全天候运行(每天 22.5 小时),满足规定的技术参数,并且在停机后(包括断电情况下)无需调整。
At the stage of equipment delivery, the Contractor shall agree with the Customer on any changes related to:
在设备交付阶段,承包商应与客户就以下相关变更达成一致:
  • layout;  布局;
  • a set of installed equipment;
    一套已安装的设备;
  • installation drawings and electrical diagrams;
    安装图纸和电气图;
  • a set of documentation;
    一套文件;
  • control program;  控制程序;
  • a list of spare parts included in the scope of supply.
    包含在供应范围内的备件清单。
Technical requirements can be amended during the work process upon agreement by the parties.
技术要求可在工作过程中经双方同意后进行修改。
Due to the current geopolitical situation the Contractor may agree with the Customer at the stage of Technical and Commercial Proposal the use of alternative manufacturers’ products for control system modules, electrical cabinets structural elements, cable and connector elements, control equipment etc.
鉴于当前的地缘政治形势,承包商可在技术和商务提案阶段与客户协商,使用替代制造商的产品,用于控制系统模块、电气柜结构元件、电缆和连接器元件、控制设备等。
VSMPO - AVISMA Corporation
VSMPO - AVISMA 公司
Technical Requirements  技术要求 Sheet 21 of 24
第 21 页,共 24 页
No. 21 012 2025 21 012 2025 21-012-202521-012-2025  编号 21 012 2025 21 012 2025 21-012-202521-012-2025
VSMPO - AVISMA Corporation Technical Requirements Sheet 21 of 24 No. 21-012-2025 | VSMPO - AVISMA Corporation | Technical Requirements | Sheet 21 of 24 | | :---: | :---: | :---: | | | No. $21-012-2025$ | |
The layout of the workpieces on the device.
工件在装置上的布局。

Appendix 2  附录 2
VSMPO - AVISMA Corporation
VSMPO - AVISMA 公司
Technical Requirements  技术要求 Sheet 22 of 24
第 22 页,共 24 页
No. 21 012 2025 21 012 2025 21-012-202521-012-2025  编号 21 012 2025 21 012 2025 21-012-202521-012-2025
VSMPO - AVISMA Corporation Technical Requirements Sheet 22 of 24 No. 21-012-2025 | VSMPO - AVISMA Corporation | Technical Requirements | Sheet 22 of 24 | | :---: | :---: | :---: | | | No. $21-012-2025$ | |
An example of self-centering V - blocks.
自定心 V 型块示例。
VSMPO - AVISMA Corporation
VSMPO - AVISMA 公司
Technical Requirements  技术要求 Sheet 23 of 24
第 23 页,共 24 页
No. 21 012 2025 21 012 2025 21-012-202521-012-2025  编号 21 012 2025 21 012 2025 21-012-202521-012-2025
VSMPO - AVISMA Corporation Technical Requirements Sheet 23 of 24 No. 21-012-2025 | VSMPO - AVISMA Corporation | Technical Requirements | Sheet 23 of 24 | | :---: | :---: | :---: | | | No. $21-012-2025$ | |

Amendment Record Sheet  修订记录表

Amdt No.  修订编号 Full Name  全名 Date  日期 Section/ Par. No.  章节/段落号 Amendment description  修订说明
1
2
dots\ldots
Amdt No. Full Name Date Section/ Par. No. Amendment description 1 2 dots | Amdt No. | Full Name | Date | Section/ Par. No. | Amendment description | | :--- | :--- | :--- | :--- | :--- | | 1 | | | | | | 2 | | | | | | $\ldots$ | | | | |
VSMPO - AVISMA Corporation
VSMPO - AVISMA 公司
Technical Requirements  技术要求 Sheet 24 of 24
第 24 页 共 24 页
No. 21 012 2025 21 012 2025 21-012-202521-012-2025  编号 21 012 2025 21 012 2025 21-012-202521-012-2025
VSMPO - AVISMA Corporation Technical Requirements Sheet 24 of 24 No. 21-012-2025 | VSMPO - AVISMA Corporation | Technical Requirements | Sheet 24 of 24 | | :---: | :---: | :---: | | | No. $21-012-2025$ | |

Office Memo No. 21/1140 dated April 09, 2025 TT No. 21-012-2025
2025 年 4 月 9 日办公备忘录第 21/1140 号 TT 第 21-012-2025 号

All versions  所有版本
Signatories:  签署人:
Signed by  签署人 Signed for  签署人 Date of signing  签署日期 Version  版本 Note  备注
Name  姓名 Title  职位 Name  姓名 Title  职位
Signed off by  签字确认
A.K.Melnikov Director, VSMPO Technical Support & Repair
VSMPO 技术支持与维修部主任
A.K.Melnikov Director, VSMPO Technical Support & Repair
技术支持与维修部主任,VSMPO
10.07.2025 08:04:08 5
S.N.Ivashkin  S.N. Ivashkin Deputy Chief Mechanical Engineer/ Planning of Maintenance and Repair
副总机械工程师/维修与保养计划
S.A. Moshkov Chief Mechanical Engineer - Head of VSMPO Chief Mechanical Engineer Department
总工程师 - VSMPO 总工程师部门负责人
09.07.2025 15:22:28 5
D.V. Devichenskiy Laboratory Manager Manager, Shop 24
实验室经理 24 号车间经理
D.V. Devichenskiy Laboratory Manager Manager, Shop 24
实验室经理,车间 24 经理
02.06.2025 14:19:19 5
M.O.Leder Director, Science and Technology , VSMPO R&D Center Manager
科学与技术总监,VSMPO 研发中心经理
M.O.Leder Director, Science and Technology , VSMPO R&D Center Manager
科学技术总监,VSMPO 研发中心经理
17.04.2025 13:53:45 1
A.V.Andreev Lead Specialist. Investment projects
投资项目首席专家
A.V.Andreev Lead Specialist. Investment projects
首席专家。投资项目
11.04.2025 12:41:45 1
D.A. Piskunov Deputy Director, Mechanical Engineering and Machining Chief Process Engineer
副主任,机械工程与加工首席工艺工程师
D.A. Piskunov Deputy Director, Mechanical Engineering and Machining - Chief Process Engineer
机械工程与加工副主任 - 首席工艺工程师
11.04.2025 09:13:08 1
K.Yu. Pankratov Chief Power Engineer - Head of VSMPO Chief Power Engineer Department
首席动力工程师 - VSMPO 首席动力工程师部门主管
K.Yu. Pankratov Chief Power Engineer - Head of VSMPO Chief Power Engineer Department
首席动力工程师 - VSMPO 首席动力工程师部门负责人
10.04.2025 18:12:49 1
D.V.Vinokurov Manager, Forging Complex Manager, Shop 21
锻造综合体经理,21 号车间经理
D.V.Vinokurov Manager, Forging Complex Manager, Shop 21
锻造综合车间经理,21 号车间经理
09.04.2025 15:08:06 1
Signed by Signed for Date of signing Version Note Name Title Name Title Signed off by A.K.Melnikov Director, VSMPO Technical Support & Repair A.K.Melnikov Director, VSMPO Technical Support & Repair 10.07.2025 08:04:08 5 S.N.Ivashkin Deputy Chief Mechanical Engineer/ Planning of Maintenance and Repair S.A. Moshkov Chief Mechanical Engineer - Head of VSMPO Chief Mechanical Engineer Department 09.07.2025 15:22:28 5 D.V. Devichenskiy Laboratory Manager Manager, Shop 24 D.V. Devichenskiy Laboratory Manager Manager, Shop 24 02.06.2025 14:19:19 5 M.O.Leder Director, Science and Technology , VSMPO R&D Center Manager M.O.Leder Director, Science and Technology , VSMPO R&D Center Manager 17.04.2025 13:53:45 1 A.V.Andreev Lead Specialist. Investment projects A.V.Andreev Lead Specialist. Investment projects 11.04.2025 12:41:45 1 D.A. Piskunov Deputy Director, Mechanical Engineering and Machining Chief Process Engineer D.A. Piskunov Deputy Director, Mechanical Engineering and Machining - Chief Process Engineer 11.04.2025 09:13:08 1 K.Yu. Pankratov Chief Power Engineer - Head of VSMPO Chief Power Engineer Department K.Yu. Pankratov Chief Power Engineer - Head of VSMPO Chief Power Engineer Department 10.04.2025 18:12:49 1 D.V.Vinokurov Manager, Forging Complex Manager, Shop 21 D.V.Vinokurov Manager, Forging Complex Manager, Shop 21 09.04.2025 15:08:06 1 | Signed by | | Signed for | | Date of signing | Version | Note | | :--- | :--- | :--- | :--- | :--- | :--- | :--- | | Name | Title | Name | Title | | | | | Signed off by | | | | | | | | A.K.Melnikov | Director, VSMPO Technical Support & Repair | A.K.Melnikov | Director, VSMPO Technical Support & Repair | 10.07.2025 08:04:08 | 5 | | | S.N.Ivashkin | Deputy Chief Mechanical Engineer/ Planning of Maintenance and Repair | S.A. Moshkov | Chief Mechanical Engineer - Head of VSMPO Chief Mechanical Engineer Department | 09.07.2025 15:22:28 | 5 | | | D.V. Devichenskiy | Laboratory Manager Manager, Shop 24 | D.V. Devichenskiy | Laboratory Manager Manager, Shop 24 | 02.06.2025 14:19:19 | 5 | | | M.O.Leder | Director, Science and Technology , VSMPO R&D Center Manager | M.O.Leder | Director, Science and Technology , VSMPO R&D Center Manager | 17.04.2025 13:53:45 | 1 | | | A.V.Andreev | Lead Specialist. Investment projects | A.V.Andreev | Lead Specialist. Investment projects | 11.04.2025 12:41:45 | 1 | | | D.A. Piskunov | Deputy Director, Mechanical Engineering and Machining Chief Process Engineer | D.A. Piskunov | Deputy Director, Mechanical Engineering and Machining - Chief Process Engineer | 11.04.2025 09:13:08 | 1 | | | K.Yu. Pankratov | Chief Power Engineer - Head of VSMPO Chief Power Engineer Department | K.Yu. Pankratov | Chief Power Engineer - Head of VSMPO Chief Power Engineer Department | 10.04.2025 18:12:49 | 1 | | | D.V.Vinokurov | Manager, Forging Complex Manager, Shop 21 | D.V.Vinokurov | Manager, Forging Complex Manager, Shop 21 | 09.04.2025 15:08:06 | 1 | |
Printed by qquad\qquad / Kolina Natalia Valeryevna / July 10, 2025.
qquad\qquad 打印 / 科利纳·娜塔莉娅·瓦列里耶芙娜 / 2025 年 7 月 10 日。

  1. 8.2.1 Certificates for hydraulic station and lubrication system.
    8.2.1 液压站和润滑系统的证书。

    8.2.2 Certificates and manuals for component parts, equipment.
    8.2.2 零部件、设备的证书和手册。

    8.2.3 Certificates of start-up control equipment, drives, electric motors.
    8.2.3 启动控制设备、驱动装置、电动机的证书。

    8.2.4 Specifications of the components used, indicating the type and manufacturer and the registered (catalog) numbers;
    8.2.4 所用部件的规格说明,注明类型、制造商及注册(目录)编号;

    8.2.5 Specification for seals and O-rings;
    8.2.5 密封件和 O 型圈的规格说明;

    8.3 Requirements for documents for installation work:
    8.3 安装作业文件的要求:

    8.3.1 Installation instructions (+electronic version of the same).
    8.3.1 安装说明(及其电子版)。

    8.3.2 Indication of safety measures, slinging and transportation schemes for assembly units, indicating the weight of the assembly units (+electronic version of the same).
    8.3.2 装配单元的安全措施指示、吊装和运输方案,注明装配单元的重量(及其电子版)。

    8.3.3 The construction assignment shall specify the following information:
    8.3.3 施工任务书应注明以下信息:
    • loads on foundation from the main and auxiliary equipment;
      主设备和辅助设备对基础的荷载;
    • duct places;  管道位置;
    • utilities connection points;
      公用设施连接点;
    • drawings on the embedded elements of the foundation (specify which elements the company supplies and which ones does not supply with the equipment).
      基础埋件图纸(注明公司提供哪些设备的埋件,哪些不提供)。

      8.4 Requirements for documents for commissioning:
      8.4 竣工验收文件要求:

      8.4.1 Acceptance (turnover) documentation.
      8.4.1 验收(交接)文件。

      8.4.2 Instructions for the operation and repair of equipment.
      8.4.2 设备操作和维修说明。

      8.5 Operational documentation:
      8.5 运行文件:

      8.5.1 Information about the maintenance procedure and regulations, a description of possible malfunctions and actions of the maintenance personnel to eliminate them.
      8.5.1 关于维护程序和规定的信息,可能出现的故障描述以及维护人员消除故障的措施。

      8.5.2 The list and frequency of routine maintenance work on the machine, a list of consumables, tools, and the amount of time required for maintenance, maintenance maps.
      8.5.2 机器的日常维护工作清单及频率,消耗品、工具清单,以及维护所需时间,维护图表。

      8.5.3 Information about the service life of the equipment.
      8.5.3 设备的使用寿命信息。

      8.5.4 Maintenance maps/schedules.
      8.5.4 维护图表/计划。

      8.5.5 General description and safety instructions.
      8.5.5 一般说明和安全指示。

      8.5.4 Operation Manual.  8.5.4 操作手册。
      8.6 Other documentation requirements:
      8.6 其他文件要求:

      8.6.1 Electrical schematic diagrams with work description.
      8.6.1 带工作说明的电气原理图。

      8.6.2 Electrical wiring diagram.
      8.6.2 电气接线图。

      8.6.3 Electrical connection diagram.
      8.6.3 电气连接图。

      8.6.4 Wiring plan.  8.6.4 布线计划。
      8.6.5 The layout of electrical equipment.
      8.6.5 电气设备布置。

      8.6.6 Cable log.  8.6.6 电缆记录。
      8.6.7 Statement of precious metals content.
      8.6.7 贵金属含量说明。

      8.6.8 Description of machine magnetics algorithms, the list of intermediate signals of magnetics.
      8.6.8 机器磁性算法描述,磁性中间信号列表。

      8.6.9 Programming manual.
      8.6.9 编程手册。