Certificate of Working completion
工作结业证书

Hyde Marine Group Limited
海德游艇集团有限公司
Ship Yard  造船厂 Ship no  发货编号 Ship Name  船舶名称 Owner  所有者 Place  地方 Working Period  工作期间
DAYANG SHANG HAI  上海 Commenced  开始 Completed  完成
SHIPBUILDING CO., LTD  造船有限公司 2024.07.07 2024.07.09
Description of Works  作品描述 Remarks  言论
Hyde Marine crane technician attended the vessel and
海德船舶起重机技术员到场并
carried out all deck crane's thorough inspection & adjustment
对所有甲板起重机进行了彻底的检查和调整
jobs, the details described as following :
jobs 中,详情描述如下:
1) Checked all deck crane's oil levels & e-motor's insu-
1) 检查了所有甲板起重机的油位和电动机的保险-
lations, the results are good.
lations,结果很好。
2} Checked all deck crane's limit switches and hydraulic
2} 检查了所有甲板起重机的限位开关和液压
pressure settings, and found some of them were slipped, then
压力设置,发现其中一些是滑落的,然后
readjusted them to normal settings.
已将它们调整为正常设置。
3) Checked all deck crane's sheaves/bearings/wire ropes
3) 检查所有甲板起重机的滑轮/轴承/钢丝绳
and found some of them were worn down over limits, recommend
并发现其中一些磨损超过限度,推荐
to replace it with spare parts. the detailed defecive ones
用备件替换它。详细的排便者
were listed in the attached sheets.
列在随附的表格中。
4) Measured all deck crane's slewing bearing clearance
4) 测量所有甲板起重机的回转支承间隙
by rocking test carried out, the recorder made in the attached
通过进行摇晃试验,将记录仪制成
sheets, the results are good.
sheets,结果很好。
5) Checked all deck crane's hydaulic pump/motor/brakes,
5) 检查了所有甲板起重机的液压泵/电机/制动器,
and found their functions are good, only oil seals leakage.
并发现它们的功能都很好,只有油封会漏油。
6) Checked all deck crane's slip rings, and found condit-
6) 检查了所有甲板起重机的滑环,发现情况
ions are ok.  离子没问题。
7) Recommend to inject enough new grease into all deck
7) 建议在所有甲板中注入足够的新润滑脂
crane's slewing bearings regularly interval every 50 working
起重机的回转支承每 50 次工作定期间隔
hours. Also for other parts lubrication points.
小时。也适用于其他部件的润滑点。
Ship Yard Ship no Ship Name Owner Place Working Period DAYANG SHANG HAI Commenced Completed SHIPBUILDING CO., LTD 2024.07.07 2024.07.09 Description of Works Remarks Hyde Marine crane technician attended the vessel and carried out all deck crane's thorough inspection & adjustment jobs, the details described as following : 1) Checked all deck crane's oil levels & e-motor's insu- lations, the results are good. 2} Checked all deck crane's limit switches and hydraulic pressure settings, and found some of them were slipped, then readjusted them to normal settings. 3) Checked all deck crane's sheaves/bearings/wire ropes and found some of them were worn down over limits, recommend to replace it with spare parts. the detailed defecive ones were listed in the attached sheets. 4) Measured all deck crane's slewing bearing clearance by rocking test carried out, the recorder made in the attached sheets, the results are good. 5) Checked all deck crane's hydaulic pump/motor/brakes, and found their functions are good, only oil seals leakage. 6) Checked all deck crane's slip rings, and found condit- ions are ok. 7) Recommend to inject enough new grease into all deck crane's slewing bearings regularly interval every 50 working hours. Also for other parts lubrication points. https://cdn.mathpix.com/cropped/2025_07_12_c316acd1c73411486238g-1.jpg?height=53&width=372&top_left_y=2137&top_left_x=1445 | Ship Yard | Ship no | Ship Name | Owner | Place | | Working Period | | :--- | :--- | :--- | :--- | :--- | :--- | :--- | | DAYANG | | | | SHANG HAI | Commenced | Completed | | SHIPBUILDING CO., LTD | | | | | 2024.07.07 | 2024.07.09 | | Description of Works | | | | | Remarks | | | Hyde Marine crane technician attended the vessel and | | | | | | | | | | | | carried out all deck crane's thorough inspection & adjustment | | | | jobs, the details described as following : | | | | | | | | 1) Checked all deck crane's oil levels & e-motor's insu- | | | | | | | | lations, the results are good. | | | | | | | | 2} Checked all deck crane's limit switches and hydraulic | | | | | | | | pressure settings, and found some of them were slipped, then | | | | | | | | readjusted them to normal settings. | | | | | | | | 3) Checked all deck crane's sheaves/bearings/wire ropes | | | | | | | | and found some of them were worn down over limits, recommend | | | | | | | | to replace it with spare parts. the detailed defecive ones | | | | | | | | were listed in the attached sheets. | | | | | | | | 4) Measured all deck crane's slewing bearing clearance | | | | | | | | by rocking test carried out, the recorder made in the attached | | | | | | | | sheets, the results are good. | | | | | | | | 5) Checked all deck crane's hydaulic pump/motor/brakes, | | | | | | | | and found their functions are good, only oil seals leakage. | | | | | | | | 6) Checked all deck crane's slip rings, and found condit- | | | | | | | | ions are ok. | | | | | | | | 7) Recommend to inject enough new grease into all deck | | | | | | | | crane's slewing bearings regularly interval every 50 working | | | | | | | | hours. Also for other parts lubrication points. | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | ![](https://cdn.mathpix.com/cropped/2025_07_12_c316acd1c73411486238g-1.jpg?height=53&width=372&top_left_y=2137&top_left_x=1445) | |
This is certify that above works have been duly completed.
这证明上述工作已正式完成。

Defective parts finding during inspection of deck cranes
在甲板起重机检查过程中发现有缺陷的零件

( YONG JIN Date:July 08 2024)
( 杨锦 日期:2024 年 7 月 8 日)

1)All deck crane’s jib jib body rusted, recommend to chipping and touch it up.
1)所有甲板起重机的臂架本体生锈,建议进行碎裂和修补。


2)All deck crane’s handrail/ladders rusted seriously, recommend to chipping&touch it up.
2)所有甲板起重机的扶手/梯子生锈严重,建议碎裂和修补。


3) No1,2,4 deck crane’s limit calibration dail and indicators damaged, recommend to replace & refit it with spare parts.
3) No1,2,4 甲板起重机的极限校准标签和指示器损坏,建议用备件替换和改装。


4) All deck crane’s hook block bolts rusted seriously, recommend to replace them with spare parts.
4) 所有甲板起重机的钩座螺栓生锈严重,建议更换备件。


5) All deck crane’s operator cabin and fixing bolts were rusted seriously, recommend to repair it.
5) 所有甲板起重机的驾驶室和固定螺栓生锈严重,建议修理。


6) All deck crane’s jib root bearing’s fixing bolts for connection flange were rusted seriously, recommend to replace them with spare parts.
6) 所有甲板起重机的臂根轴承的连接法兰固定螺栓生锈严重,建议更换备件。