飞机大修智能控制平台  Aircraft Overhaul Intelligent Control Platform
机库机位管理   Hangar parking management
名称(机库+机位)  Name (Hangar + Stand)状态  Status优先级(1最高)  Priority (1 is highest)影响当前机位的机位  Affected adjacent stands机型  Aircraft Type机位满足生产条件  Bay meets operational conditions操作  Operation
1期机库1号位  Hangar 1 Phase I, Position 1 正常   Normal1 1期机库2号位   Position 2, Phase 1 Hangar
A319 A320 A321
液压   Hydraulic 电源   Power Supply 尾坞   Tail Dock 顶升   Jacking 大翼坞   Wing Dock 空调   Air Conditioning
1期机库-1临时机位  Phase 1 Hangar - Temporary Parking Stand 1 正常   Normal3 1期机库2号位   Position 2, Phase 1 Hangar
B737-300 B737-800 A319 A320 A321
液压   Hydraulics 空调   Air Conditioning
1期机库2号位  Hangar 1 Bay 2 正常   Normal2
B737-300 B737-800 A319 A320 A321
液压   Hydraulic 电源   Electrical Power 顶升   Jacking 大翼坞   Wing Dock 空调   Air Conditioning
1期机库3号位  Hangar 1 Bay 3 正常   Normal1 1期机库2号位   Position 2, Phase 1 Hangar
B737-300 B737-800 A319 A320 A321
液压   Hydraulic 电源   Electrical Power 尾坞   Tail Dock 顶升   Jacking 大翼坞   Wing Dock 空调   Air Conditioning
1期机库机库-3临时机位  Phase 1 Hangar - Temporary Parking Position 3 正常   Normal 1期机库2号位   Position 2, Phase 1 Hangar
A319 A320
空调   Air Conditioning 电源   Power Supply
x1
>
<
>>
<<
O
x1
B-6008(CDC)
项目经理:  Project Manager:-
生产准备员/工程师:  Production Preparation Staff/Engineer:-
计划执行时间 2025-07-07 09:00-2025-08-06 18:00
Scheduled execution time 2025-07-07 09:00-2025-08-06 18:00
飞机进库时间  Aircraft Inbound Time
飞机出库时间  Aircraft Outbound Time
工作描述:  Job Description: